WIND RESOURCE ASSESSMENT / EGYPT

WIND RESOURCE ASSESSMENT / EGYPT
WIND RESOURCE ASSESSMENT / EGYPT
WIND RESOURCE ASSESSMENT / EGYPT

The project is being developed by the New and Renewable Energy Authority (NREA) and Masdar. The electricity generated from the project will be supplied to the Unified Electric Grid in Egypt thereby replacing electricity that would otherwise have been generated from conventional power plants using fossil fuel. The project will be implemented in cooperation between NREA and DANIDA and is located approx. 200 km south east of Cairo on the Red Sea coast approximately 80 km south of the Suez in a desert area with no settlements in the direct vicinity. Because of the high level of importance of this project and the remote region, Kintech Engineering was appointed by a consultant to supply 3 complete turnkey wind measurement stations consisting of 90 meter lattice masts (installed by one of our partners) equipped with EOL Zenith data loggers, satellite modems for remote communication and high quality anemometers and wind vanes from Thies Clima.

WRITE A COMMENT

RELATED POSTS

Enter your keyword