27
Jul
This project is a joint venture between Fred Olsen Renewables and Finnmark Kraft AS. It is located in the municipality of Kvalsund, County of Finnmark. Based on a 180 MW layout, the production is estimated at 558 GWh, corresponding to the electricity consumption of roughly 27,900 Norwegian households. Kintech Engineering was appointed by a consultant to supply instrumentation and installation of a 80m wind measuring mast in Falesrassa 1 Wind Farm near Hammarfest, Norway. The area is cold climate and icing conditions are severe.